|
|
|
|||
Preparing to Insert the Sample Tube in the Probe
|
||||
|
The Sample
Compartment
Inside the Sample Compartment
|
Getting Previous Sample OUT |
|||
|
Holding the sample tube
for
removal/insertion → |
|
|||
Preparing the Sample Tube – Step 1
|
Preparing the Sample Tube – Step 2
Insert Tube in Spinner
Turbine
|
|||
|
Preparing the Sample Tube – Step 3
Wipe the
turbine and tube again |
Preparing the Sample Tube – Step 4
The depth gauge will position
the turbine
|
|||
|
Preparing the Sample Tube – Step 5
Insert tube in depth gauge
|
Preparing the Sample Tube – Step 6
Push tube down until it stops
|
|||
|
The sample is now ready to insert in the
probe |
|
|||